Easy

Be A Trailblazer

Accessible Nature Walk

Sat. Jun 6

10:00 am

-

11:30 am

2 miles

Closed

Join us on the West side of the trail over the pedestrian bridge from the Wilton Metro North train stop. This bridge crosses over the tracks and leads right onto the NRVT at Merwin Meadows Park. This section of trail is often utilized by the Wilton High School track teams, it continues north by the area of the Dana Dam take-down, and then hits the north end of the loop in Allen’s Meadows at Olmstead Hill Road. There are beautiful views of the Norwalk River from this section and the remaining sections meander through old woodlands and wetlands with some boardwalks.

Event Leader(s)

Jeanne Kelly

(917) 536-6310

jkelly@nrvt-trail.com

Rain Date

No Rain Date

Organization Partners

Meeting Location Details

41.194950, -73.432639 in Google Maps

Meet at Rise Doughnuts, located at 28 Center St in Wilton, CT

Click on the red map pin for the event address.

Leashed Dogs Permitted

Wheelchair accessible